Montigo L38DF-ST Manual do Utilizador Página 10

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 34
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 9
L38DF-ST* Indoor Gas Fireplace
Page 10
XG0810 - 150204.2
Installation
Figure 9. Top vent, Roof mounted termination with no offset in vent
run.
Roof mounted Terminations
The following details are some possible congurations for Roof
mounted terminations.
Section 3-2: Installing a Roof Mounted Direct Vent
Termination (PVTK-1)
This section applies to installations where the direct vent termi-
nation will be roof mounted.
Section 3-2-1: VENTING LAYOUT
Selection of components and details of venting lay out should
adhere to the following guidelines:
The maximum termination point is 32’ above the replace.
(NOTE: if the maximum termination height is used, the ame
pattern may be affected).
The Vertical termination must be a minimum 2’ higher
than where the termination exits the roong materials,
(asphalt shingles, cedar shakes, etc). This distance should
be measured from the high side of the roof slope where the
ue ashing intersects the roong materials. (see Figures
9 - 9c).
For a detailed diagram of allowed termination locations, see
Appendix A.
Termination location must be a minimum 6’ from a mechanical
air inlet.
A maximum of two offsets (each offset is made up of 2-90°
bends) may be made for vertical vent runs.
Firestops must be installed as required by National & local
codes.
Ensure all horizontal runs are supported with a minimum of 3
supports per 10’ of venting.
Install all roof ashing and storm collars as shown.
PVTK1 Termination
PEXT
PEXT-10
Adaptor
Flue
Collar
Figure 9a. Top vent, Roof mounted with 1 offset (1 offset= two 90°
bends).
Figure 9b. Top vent, Roof mounted with 2 offsets (1 offset= two 90°
bends).
PVTK1 Termination
PVTK1 Termination
Vista de página 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 33 34

Comentários a estes Manuais

Sem comentários