M40DV-CR/CL Corner Gas Fireplace
Installation
Installation Of Vertical Vent DV
Vertical Terminations must be installed:
minimum 2' (two feet) above the highest point where
vent passes through the roof.
minimum 6' (six feet) from a mechanical air inlet
minimum 18" (1 1/2 feet) from a parapet wall.
Maximum vent height is 30 feet above fireplace.
Note: Flame characteristics will change if the maximum vent
height is used.
Minimum clearance to combustible construction around the
vent pipe is 1" on all sides must be maintained, except on hori-
zontal venting where the top of the pipe must have a clearance of
at least 2".
A maximum of two offsets (each oset has two 90° bends) may be
made if the length of the offsets does not exceed 25% of the vertical
vent height, when measured center to center of piping.
Example: Typical vent installation.
30' vertical vent
2 - 2' offsets required
25% of 30' = 7-1/2' max. offset allowed
This venting configuration meets requirements.
A - Termination PVTK-1
B - Flex sections PFL-1 (12" section)
PFL-2 (24" section)
PFL-3 (36" section)
PFL-4 (48" section)
C - Solid sections PEXT-1 (12" section)
PEXT-2 (24" section)
PEXT-3 (36" section)
PEXT-4 (48" section)
D - Support Ring & Plate PSPXT-7 (8" dia.)
E - Firestop PS-8 (8" dia.)
F - Roof Flashing PRF-7 (1/12 - 7/12 pitch)
PRF-12 (7/12 - 12/12 pt.)
Figure 18. Vertical venting using 2 osets (1 oset= two 90° bends).
* If reducing to 4"/7" venting see gure 19.
Figure 17. Vertical venting using 1 oset (1 oset= two 90° bends).
* If reducing to 4"/7" venting see gure 19.
Figure 16. Straight, vertical venting.
* If reducing to 4"/7" venting see gure 19.
Top Vent
Vista de página 11