
Page 5
L-Series DF-ST See-thru Gas Fireplace
Part No. XG0812
Installation
Installing Terminations with Built-In Frames
Installing Terminations with MSR Frames
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.
1. Frame the termination opening to 11" x 11".
2. Fasten the termination to the studs using a minimum of 4
screws.
Installing Terminations with MOSR Frames
MOSR
1. Frame the termination opening to 12" x 12".
2. Fasten the MOSR frame to the interior side of the studs using a
minimum of 4 screws.
3. Insert the termination into the MOSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.
MSR
PTO-3F (5"/8")
PTO-3F (5"/8")
PTO-3F (5"/8")
PTKOG (5"/8")
1. Ensure that the two
long mounting brackets are facing the bottom
of the termination. (See inset). This will provide more heat protection
at the top of the termination, where temperatures are highest.
2. Attach to the faceplate of the termination using four sheet metal
screws.
Installing Heat Guards over Terminations
Installing the Nailing
Flange Extension
Once the replace is placed into the rough framed opening, and the
supplied steel lintel is in place, (see Figure 2), the supplied nailing
extension must be placed along the top edge of the replace, and
securely fastened in place to the metal lintel, and wood framing.
Figure 6c. Installing the Nailing Flange Extension.
Comentários a estes Manuais